Information
| Unit | YUMURTALIK VOCATIONAL SCHOOL |
| Code | YSA226 |
| Name | Underwater Structers and Consulting |
| Term | 2018-2019 Academic Year |
| Semester | 4. Semester |
| Duration (T+A) | 2-1 (T-A) (17 Week) |
| ECTS | 3 ECTS |
| National Credit | 2.5 National Credit |
| Teaching Language | Türkçe |
| Level | Ön Lisans Dersi |
| Type | Normal |
| Label | C Compulsory |
| Mode of study | Yüz Yüze Öğretim |
| Catalog Information Coordinator | Öğr. Gör. Arben Erol MALJA |
| Course Instructor |
Öğr. Gör. Dr. ÖZGÜR YILMAZ
(Bahar)
(A Group)
(Ins. in Charge)
|
Course Goal / Objective
Construction of underwater structures and diversity, how it is planned, yapılılış basic principles, as well as the divers to work underwater construction and structures should be careful in terms of environmental and life safety issues to teach.
Course Content
Ground survey and underwater bathymetry, underwater concrete and pouring techniques, port and pier construction, scaffolding winding protection systems, dams, pipelines, cable laying work, off-shore fish farm mooring installation, environmental and life safety measures.
Course Precondition
Yok
Resources
Notes
Diğer Kaynaklar
Course Learning Outcomes
| Order | Course Learning Outcomes |
|---|---|
| LO01 | Performs ground survey before the works planned to be done underwater. |
| LO02 | Applies the technique of pouring the concrete for this work of the planned underwater. |
| LO03 | Takes part in the laying of underwater pipelines. |
| LO04 | Provides consultancy in underwater system installation. |
| LO05 | Selects the diving personnel suitable for the underwater work to be done. |
| LO06 | Selects the appropriate diving system for the underwater work to be done. |
| LO07 | Takes the measures required by the occupational safety and worker health legislation for the environment and life safety. |
Relation with Program Learning Outcome
| Order | Type | Program Learning Outcomes | Level |
|---|---|---|---|
| PLO01 | - | Think in algorithmic manner; define problems about material and equipment encountered in the field of diving with fundamental engineering point of view. | 5 |
| PLO02 | - | Establish technical communication by using technical language in terms of technical drawing and its field. | 3 |
| PLO03 | - | Gain ability to question the underwater activities, in terms of biological and recreational manner. | 5 |
| PLO04 | - | Possess awareness in terms of occupational ethics in under water engineering applications. | 3 |
| PLO05 | - | Take precautions of safety of diving in evaluating problems of underwater engineering works, make experiment, collect data and represent this data and interpret its fundamentals. | 3 |
| PLO06 | - | To take responsibility and to solve the unforeseeable problems during underwater works | 4 |
| PLO07 | - | To have and to apply the seamanship knowledge | 1 |
| PLO08 | - | Work as a team and individually in operations of pipe line laying and maintenance, in search and rescue, in surveying operations, in rescuing of lagans or repairing lagan ships on the water, in underwater construction and repairs, in engineering activities of diving. | 5 |
| PLO09 | - | To manage a diving operations within the framework of diving techniques and safety knowledge | 4 |
| PLO10 | - | Use required modern technical material and equipment by taking additional training, renew him/her continuously, show that he/she is aware of long life learning requirement by following occupational and academic developments in the field. | 3 |
| PLO11 | - | Communicate with his/her colleagues and track data in his/her field by using a foreign language minimum in A2 general level of European Language portfolio. | 0 |
| PLO12 | - | Obtain ability to plan the process about a system (pressure room, diving system, diving plan, material and equipment selection and erection of them) which would meet requirements of his/her job. | 5 |
Week Plan
| Week | Topic | Preparation | Methods |
|---|---|---|---|
| 1 | Bathymetry, underwater topography | Studying related books | |
| 2 | Definition and preparation of underwater concrete | Studying related books | |
| 3 | Underwater concrete placement techniques | Studying related books | |
| 4 | Port, pier and dock construction | Studying related books | |
| 5 | Winding foot pier protection | Studying related books | |
| 6 | Check Dam construction and diving | Studying related books | |
| 7 | Types of Pipelines, trim techniques | Studying related books | |
| 8 | Mid-Term Exam | Studying related books and lecture notes | |
| 9 | And the laying of underwater cable | Studying related books | |
| 10 | Fish farm off-shore installation, mooring | Studying related books | |
| 11 | And protection of bridge piers | Studying related books | |
| 12 | Underwater tunnels | Studying related books | |
| 13 | Offshore Oil and Gas | Studying related books | |
| 14 | The shipyard, a pool, and the pulling sled construction | Studying related books | |
| 15 | Underwater construction and structures and measures of environmental hazards | Studying related books | |
| 16 | Final exam | Studying related books and lecture notes | |
| 17 | Final exam | Studying related books and lecture notes |
Assessment (Exam) Methods and Criteria
| Assessment Type | Midterm / Year Impact | End of Term / End of Year Impact |
|---|---|---|
| 1. Midterm Exam | 100 | 40 |
| General Assessment | ||
| Midterm / Year Total | 100 | 40 |
| 1. Final Exam | - | 60 |
| Grand Total | - | 100 |
Student Workload - ECTS
| Works | Number | Time (Hour) | Workload (Hour) |
|---|---|---|---|
| Course Related Works | |||
| Class Time (Exam weeks are excluded) | 14 | 3 | 42 |
| Out of Class Study (Preliminary Work, Practice) | 14 | 2 | 28 |
| Assesment Related Works | |||
| Homeworks, Projects, Others | 1 | 2 | 2 |
| Mid-term Exams (Written, Oral, etc.) | 1 | 5 | 5 |
| Final Exam | 1 | 10 | 10 |
| Total Workload (Hour) | 87 | ||
| Total Workload / 25 (h) | 3,48 | ||
| ECTS | 3 ECTS | ||